Projects & Events Report 

1. Install Power to Decorative Lighting by Gazebo.

2. Install Decorative Lighting and power to poles by Amusement Park Area. Currently Working.

3. Annual Spring Cleanup – May 3 (Rain Date May 4) Cancelled

4. Tag/Craft Sale- May 10 (Rain Date May 17).

5. Weed & mulch islands in the Parking Lot. – ON-GOING.

6. A Living Museum A Beach Experience Program throughout the season.

7. Bake Sales - (During scheduled Firework dates) – Dates To Be Determined.

8. Silly Hat Parade (Tony Pero Day) – Date To Be Determined.

9. Overall maintenance/upkeep of the Playscape & Waterplayground areas. ON-GOING.

10. Overall maintenance/upkeep of the Alewife Cove Naturewalk Trail. ON-GOING.

11. Installation and purchase of Larry The Lobster Feature. 

12. Completion of Painting of the Children’s Playscape. 

13. “Junk In The Trunk” Fundraiser. 

14. Annual Fall Cleanup – Date To Be Determined.

15. Raising funding for the Light Tower relocation to the original Clock Tower Foundation on the

Boardwalk for a Clock Tower. – TABLED


Tentative Projects in Steering Committee


1. Install stone dust sidewalk for Brick Paver Project along Gazebo Area. Need layout & Cost

Estimate. (Work on after Tag/Craft Sale.)

2. Cost Estimate for the purchase of Brick Pavers for stone dust sidewalk to determine a cost

verses profit margin. Work on after Tag/Craft Sale.


Previous Projects

1. Archway signs

2. Rebuilt boardwalk

3. Creation of dedication benches

4. Restore playground

5. Poles and decorations for walkway

6. Complete gazebo

7. Purchase wheelchair for the ocean